Search
  • Home
  • Community
  • News & Events
  • Departments
  • Resources
  • Contact Us

Departments

Road Work

Each year the Public Works Director presents to the Board of Supervisors of East Norriton Township the proposed Road Improvement Program for consideration. After the proposed Road Improvement Program is approved by the Board of Supervisors, the Township advises all of the affected properties of the pending work and the anticipated dates which each road will be repaved.

Please be advised that during the Overlay Operation the street will be closed to all traffic except for emergency situations. During the paving operation, it will be necessary to park your car on a side street, as no traffic will be allowed in or out on the street during the actual work. This is necessary since the blacktop can not be driven on until it has cooled. Also since the blacktop will be at temperatures over 250 degrees it is highly recommended that you keep your children and pets away from the paved area. Any contact with the hot material will result in serious burns. The Township requests your patience and cooperation during the paving operation. All streets to be overlaid will be posted (NO PARKING) the day before the actual paving operation. This should allow you ample time to adjust your parking schedule accordingly.

It is also the responsibility of the individual property owner to remove buildup of any vegetation that may be growing between the curb and street. Further, each property owner should check their mailbox to make sure that it does not protrude past the backside of the curb. Any mailbox protruding past the backside of the curb is considered an illegal one and should be removed and placed in the proper area. This will ensure that the mailbox will not be damaged during the paving operation. You should arrange to have this work done prior to the paving of your street. Any improperly installed mailbox which is damaged during paving will not be replaced by the Township.

Finally, all driveway ramps which protrude out into the street beyond the curbing will be removed during the milling process. These ramps will not be replaced by the Township during the paving process and should not be replaced by the property owner after the street has been paved because of the safety hazard which they create. In addition, if your street is milled prior to paving, the road will be repaved back to its original height on the curbing.

Each year, the Overlay Project's schedule is posted in the local newspaper prior to the beginning of the project. In addition, the Township notifies each homeowner with a more definite starting date for each road being paved. If you have any question, please feel free to contact the Public Works Department at (610) 275-2800, Extension 147. Thank you for your time and cooperation in this matter

 

      

  • Code Enforcement
  • Finance
  • Human Resources
  • Parks and Recreation
  • Public Works
    • Compost / Recycling
    • Road Work
    • Sanitary Sewer System
    • Snow Plowing
    • Storm Water Permit Program
    • Leaf and Yard Waste Collection
    • Contact Public Works
  • Public Safety

East Norriton Township

2501 Stanbridge Street

East Norriton, PA 19401-1616

© 2009 East Norriton Township. All rights reserved.

Web Design & Development by Delphic Sage

Phone: (610) 275-2800

Fax: (610) 277-1879

Office Hours: 8am - 4pm (Mon-Fri)

Privacy Policy Terms Of Use Sitemap Directions